Tips To Reduce Rework During Construction

Construction rework is a costly, time-consuming process. It’s necessary to rework an incorrect or unsafe part of the construction to avoid structural issues or an unhappy homeowner, but that still doesn’t make the task pleasant or affordable. Mistakes may always happen, but you can use these tips to improve your construction process and avoid inconvenient rework. Pick up the latest rotary laser level and other tools to update your planning and construction.

Carefully Review the Designs

Construction issues related to the designs can happen in one of two ways. First, it may be due to mistakes in the design plans. Second, it can be caused by mistakes in following the designs. Take time to carefully review the renderings, blueprints and other design materials before you kickoff the construction process. Reviewing and checking for errors in the plans is a great way to avoid mistakes.

Another way is to continue to review the plans as you build. Be sure all of your contractors have access to the designs and periodically review them. This may not prevent every single mistake, but it can reduce the risk of rework. While a contractor may have carefully reviewed the plans weeks ago, they need to have the plans on-hand to avoid mistakes in ordering and installing materials.

Inspect Your Materials

Working with less-than-optimal materials can put your construction project at risk. Subpar building materials is another common reason that contractors need to backtrack and rework their plans. Invest in reliable materials that are easy to work with and come with fewer manufacturing errors and inconsistencies.

Work With the Best Contractors in Your Area

It takes a professional eye to spot a construction issue that requires rework. Spotting an issue quickly dramatically reduces the time and stress of removing, repairing and rebuilding a particular building feature. General contractors should carefully vet their contractors to find experienced professionals. These confident builders can reduce the number and severity of errors throughout the process.

The tools professionals use matter. Experienced contractors invest in everything from a rotary laser level to state-of-the-art cordless tools to measure, cut and install building elements. Construction projects are only as precise as their measurement devices. Review the latest measuring and design tools to see how you can avoid measuring and calculation errors on the jobsite.

Find Ongoing Training Solutions

It’s never too late to learn new tricks of the trade, particularly in the construction industry. New construction techniques and building elements continue to accelerate the timetable and improve the efficiency of the building process. Find local or online resources that allow your carpenters, plumbers, electricians and other professionals to stay current on the latest techniques in their trade.

Communicate Throughout the Process

Finally, some rework issues are caused by miscommunication. When a contractor starts a process too soon or doesn’t hear about a change in the design, it usually results in costly rework. The general contractor’s role is critical in keeping everyone on the same page during the construction process. This is a crucial role that prevents rework tasks as a result of a change in designs.

From minor alterations to a major change in direction, every design decision should be immediately spread to the contractors who are involved in that particular process. These design redirections can change the timetable of your building process, so remember to inform contractors about any potential delays or accelerations in their scheduling.

Shop for Quality Engineering Tools

Enjoy accurate measurements and convenient design tools with the latest drafting equipment from Engineer Supply. Compare unique rotary laser level options or order a drafting table to keep your building plan up to date and reduce the risk of construction rework.